Underfloor Heating Guide

Our planks/tiles are suitable over underfloor heating systems, but they should have been insulated so that its surface temperature does not go over 27°C (80°F). 


The underfloor heating must be switched off 48 hours before, during, and 48 hours after the installation, then temperature gradually increased (typically 3°C/hr) to desired warmth. Please consult the manufacturer to make sure their system is compatible with our flooring. 


Mesh/Wire systems must be bedded into a base coat of reinforced fibre smoothing compound to cover the wires or mesh. Then a second coat of primer and reinforced fibre smoothing compound should be applied as a finish coat. This is applicable for both concrete and timber construction subfloors. Prime surface before applying a compatible smoothing compound to a minimum of 3mm.


Contact us for more information.